# 8 × 20 Garden Chicken Coop: Standard

[View illustrated instructions](https://diyplans.org/plans/8x20-garden-chicken-coop/variants/standard)

[Plan and other configurations](https://diyplans.org/plans/8x20-garden-chicken-coop.md)

A raised henhouse with three outside nest boxes, two long roosts, a covered walk-in run and a continuous buried predator barrier.

## License

[CC BY-NC-SA 4.0 International](https://creativecommons.org/licenses/by-nc-sa/4.0/). You may share and adapt this free design for noncommercial purposes with appropriate credit, a link to the license, an indication of changes, and the same license on adaptations. See [the FAQ](https://diyplans.org/faq#license) for details and exceptions.

Revision: 2

Status: published

Difficulty: advanced

## Before you start

- Unverified concept materials. Not construction-ready. Obtain independent qualified design and review before building.
- Confirm site drainage, utilities, local snow and wind loads, foundations, anchors and structural connections with a qualified local designer before construction. The model has not been physically built.
- Retain the horizontal rafter ties and the 6:12 roof pitch shown.
- Use the drawings and schedules together; confirm stock sizes and hardware before cutting.

## Dimensions

- Base length: 240 in
- Base width: 96 in
- Henhouse length: 72 in. Raised 32 in above the ground datum.
- Ramp horizontal run: 60 in. 40 in rise; 16 in wide.
- Buried mesh depth: 18 in. 12 in outward toe, with secured overlaps.

## Shopping list

8 × 20 Garden Chicken Coop. Whole-stock quantities preserve the original cutting layout, with separate reserves. Cut blanks round upward to the next 1/16 in; fit finished profiles to CAD. Buried mesh uses one 70 ft allowance, separate from the wall-mesh roll. Hardware quantities marked as allowances do not establish structural capacity.

- 1 boards: Timber, 1x12, 12 ft. Packed 2 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 board: Timber reserve, 1x12, 8 ft spare. One separate spare for this stock family, in addition to the cutting layout. Allows rejection of knots, checks, damaged ends, and cutting errors. Inspect structural lumber grade before purchase.
- 1 boards: Timber, 1x2, 8 ft. Packed 85 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 5 boards: Timber, 1x2, 10 ft. Packed 85 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 9 boards: Timber, 1x2, 12 ft. Packed 85 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 6 boards: Timber, 1x2, 16 ft. Packed 85 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 board: Timber reserve, 1x2, 8 ft spare. One separate spare for this stock family, in addition to the cutting layout. Allows rejection of knots, checks, damaged ends, and cutting errors. Inspect structural lumber grade before purchase.
- 2 boards: Timber, 1x2 ground-contact compatible, 8 ft. Packed 6 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 4 boards: Timber, 1x2 ground-contact compatible, 10 ft. Packed 6 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 board: Timber reserve, 1x2 ground-contact compatible, 8 ft spare. One separate spare for this stock family, in addition to the cutting layout. Allows rejection of knots, checks, damaged ends, and cutting errors. Inspect structural lumber grade before purchase.
- 2 boards: Timber, 1x4, 8 ft. Packed 4 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 board: Timber reserve, 1x4, 8 ft spare. One separate spare for this stock family, in addition to the cutting layout. Allows rejection of knots, checks, damaged ends, and cutting errors. Inspect structural lumber grade before purchase.
- 6 boards: Timber, 2x2, 8 ft. Packed 33 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 2 boards: Timber, 2x2, 10 ft. Packed 33 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 boards: Timber, 2x2, 12 ft. Packed 33 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 2 boards: Timber, 2x2, 16 ft. Packed 33 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 board: Timber reserve, 2x2, 8 ft spare. One separate spare for this stock family, in addition to the cutting layout. Allows rejection of knots, checks, damaged ends, and cutting errors. Inspect structural lumber grade before purchase.
- 1 boards: Timber, 2x3, 16 ft. Packed 2 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 board: Timber reserve, 2x3, 8 ft spare. One separate spare for this stock family, in addition to the cutting layout. Allows rejection of knots, checks, damaged ends, and cutting errors. Inspect structural lumber grade before purchase.
- 5 boards: Timber, 2x4, 8 ft. Packed 55 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 7 boards: Timber, 2x4, 10 ft. Packed 55 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 2 boards: Timber, 2x4, 12 ft. Packed 55 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 3 boards: Timber, 2x4, 16 ft. Packed 55 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 board: Timber reserve, 2x4, 8 ft spare. One separate spare for this stock family, in addition to the cutting layout. Allows rejection of knots, checks, damaged ends, and cutting errors. Inspect structural lumber grade before purchase.
- 6 boards: Timber, 2x6, 8 ft. Packed 100 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 boards: Timber, 2x6, 10 ft. Packed 100 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 15 boards: Timber, 2x6, 12 ft. Packed 100 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 14 boards: Timber, 2x6, 16 ft. Packed 100 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 board: Timber reserve, 2x6, 8 ft spare. One separate spare for this stock family, in addition to the cutting layout. Allows rejection of knots, checks, damaged ends, and cutting errors. Inspect structural lumber grade before purchase.
- 3 boards: Timber, 2x8, 8 ft. Packed 17 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 2 boards: Timber, 2x8, 16 ft. Packed 17 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 board: Timber reserve, 2x8, 8 ft spare. One separate spare for this stock family, in addition to the cutting layout. Allows rejection of knots, checks, damaged ends, and cutting errors. Inspect structural lumber grade before purchase.
- 2 boards: Timber, 4x4, 12 ft. Packed 15 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 5 boards: Timber, 4x4, 16 ft. Packed 15 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 board: Timber reserve, 4x4, 8 ft spare. One separate spare for this stock family, in addition to the cutting layout. Allows rejection of knots, checks, damaged ends, and cutting errors. Inspect structural lumber grade before purchase.
- 2 boards: Timber, 4x6 ground-contact treated, 8 ft. Packed 8 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 boards: Timber, 4x6 ground-contact treated, 12 ft. Packed 8 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 2 boards: Timber, 4x6 ground-contact treated, 16 ft. Packed 8 cut segments across this stock family; 1/8 in kerf between cuts. See stock-layout.csv. Net cutting purchase. Add the separate spare board below. Factory ends may be used for exact stock-length members.
- 1 board: Timber reserve, 4x6 ground-contact treated, 8 ft spare. One separate spare for this stock family, in addition to the cutting layout. Allows rejection of knots, checks, damaged ends, and cutting errors. Inspect structural lumber grade before purchase.
- 6 sheets: Sheet goods, 1/2 in exterior panel siding, 4 x 8 ft. Guillotine nesting of 16 full rectangular/profile bounding blanks, including 1/8 in kerf. See sheet-layout.csv. No credit for door/window cutouts. Roof panel long axes kept along recorded length. Smooth panels; directional siding needs a revised layout.
- 1 sheet: Sheet reserve, 1/2 in exterior panel siding, 4 x 8 ft spare. One separate spare sheet in addition to the nesting layout. Covers damaged edges and fitting changes. Do not substitute a lower structural span rating.
- 2 sheets: Sheet goods, 1/2 in exterior plywood, 4 x 8 ft. Guillotine nesting of 9 full rectangular/profile bounding blanks, including 1/8 in kerf. See sheet-layout.csv. No credit for door/window cutouts. Roof panel long axes kept along recorded length. Smooth panels; directional siding needs a revised layout.
- 1 sheet: Sheet reserve, 1/2 in exterior plywood, 4 x 8 ft spare. One separate spare sheet in addition to the nesting layout. Covers damaged edges and fitting changes. Do not substitute a lower structural span rating.
- 9 sheets: Sheet goods, 1/2 in exterior roof plywood, 4 x 8 ft. Guillotine nesting of 16 full rectangular/profile bounding blanks, including 1/8 in kerf. See sheet-layout.csv. No credit for door/window cutouts. Roof panel long axes kept along recorded length. Smooth panels; directional siding needs a revised layout.
- 1 sheet: Sheet reserve, 1/2 in exterior roof plywood, 4 x 8 ft spare. One separate spare sheet in addition to the nesting layout. Covers damaged edges and fitting changes. Do not substitute a lower structural span rating.
- 3 sheets: Sheet goods, 3/4 in exterior plywood, 4 x 8 ft. Guillotine nesting of 8 full rectangular/profile bounding blanks, including 1/8 in kerf. See sheet-layout.csv. No credit for door/window cutouts. Roof panel long axes kept along recorded length. Smooth panels; directional siding needs a revised layout.
- 1 sheet: Sheet reserve, 3/4 in exterior plywood, 4 x 8 ft spare. One separate spare sheet in addition to the nesting layout. Covers damaged edges and fitting changes. Do not substitute a lower structural span rating.
- 1 roll: Mesh, 1/2 in square, 19 ga galvanized-after-weld hardware cloth; 48 in x 100 ft. Reserve 70 linear ft x 48 in for 56 ft perimeter, corner wraps, toe patches and seam overlaps. Bends are one sheet: do not add vertical faces and toes. 18 in up + 18 in down + 12 in toe; trim gate above-grade leg. Remaining roll length is spare.
- 1 rolls: Mesh, 1/2 in square, 19 ga galvanized-after-weld hardware cloth; 48 in x 100 ft. Separate nesting for 15 run, gate, under-house and eave pieces; existing overlaps included. See mesh-layout.csv. Full bounding blanks; gable offcuts remain spare. No burial material counted here. Verify supplier roll width and corrosion coating; maintain all drawing overlaps.
- 1 rolls: Mesh, 1/4 in galvanized welded hardware cloth, 24 in x 10 ft. Henhouse vent screens; nested full blanks. This fine layer does not replace the heavier run mesh. Retain at least the modeled perimeter overlap and protect cut edges.
- 16 panels: Roofing, Metal roof panels, 36 in coverage, painted galvanized/Galvalume. Each eave-to-ridge coverage blank is 67 11/16 in before product-specific order allowances; 16 coverage pieces modeled. Order continuous panels only after setting ridge/eave trim allowances. Nominal 6 ft stock is a candidate, not a confirmed final cut. Last coverage strip each side is ripped.
- 3 sections: Roofing, Matching ridge cap, 10 ft sections. One assembled ridge of 22 ft. Two CAD faces represent one folded cap. Quantity includes 2 ft total lap/cut allowance; verify manufacturer's lap requirement.
- 6 sections: Roofing, Matching eave/drip flashing, 10 ft sections. 2 eaves totaling 44 ft. Allow 1 ft per eave for laps and trimming; confirm selected product.
- 4 sections: Roofing, Matching rake/gable flashing, 10 ft sections. Four sloping edges total about 22 ft 4 5/16 in; one unspliced section per edge. Detail not represented by individual corrugated trim solids; field fit to selected roof system.
- 286 sq ft minimum coverage: Roofing, Metal-compatible roofing underlayment. Modeled main-roof coverage 248.0172 sq ft plus 15% for laps and fitting. Convert to whole manufacturer rolls using net coverage; select temperature rating and deck compatibility.
- 14 sets: Hardware, Exterior hinges, complete sets. One complete fitting per modeled hinge/latch position. Select rating, offset and corrosion finish for finished door weight and actual swing; model plates are locating envelopes.
- 4 sets: Hardware, Two-action cleanout latches, complete sets. One complete fitting per modeled hinge/latch position. Select rating, offset and corrosion finish for finished door weight and actual swing; model plates are locating envelopes.
- 1 sets: Hardware, Two-action run gate latch with inside release. One complete fitting per modeled hinge/latch position. Select rating, offset and corrosion finish for finished door weight and actual swing; model plates are locating envelopes.
- 1 fabricated set: Roofing, Nest roof metal and wall flashing. Coverage blank 52 x 20 5/8 in; see nest profile. Use a formed compatible sheet or selected 3:12-rated roof product. Main-roof offcuts may help, but no reuse is assumed. Add wall flashing and closure pieces.
- 1 board: Threshold, Exterior hardwood 1x6, 8 ft, actual thickness 3/4 in. Rip/cut threshold blank 37 1/2 x 4 in. Seal ends and relieve exposed edges. Spare length available for fitting.
- 7 boxes of 100: Nonstructural hardware, Exterior corrosion-compatible #8 or #10 x 2 in batten screws. At least 604 positions at maximum 6 in centers, plus 10% allowance rounded to boxes. Clamp-only preliminary spacing; embed at least 1 in into timber and avoid points projecting into bird space. Use greater protection where soil/treatment requires it.
- 300 pieces: Nonstructural hardware, Galvanized/stainless mesh seam ties or hog rings. Design allowance for bury-strip laps, corner patches and seams away from clamp battens. Tie at no more than 4 in centers; recount final seam length. Match mesh coating and avoid sharp tails.
- 2 complete sets: Nonstructural hardware, Nest hatch exterior hinges. Allowance for one external hatch. Check hatch weight and chosen opening direction; fit positive hold-open hardware.
- 2 complete sets: Nonstructural hardware, Nest hatch two-action latches. Allowance to retain both ends of hatch. Use positive stops and seals; do not rely on friction or gravity.
- 1 set: Nonstructural hardware, Pop-door closed-position retaining pin/latch and lift handle. Sliding door must remain secured when shut. Pin must be operable from the run and inaccessible to predators through mesh.
- 8 sets: Nonstructural hardware, Removable under-house panel fasteners. Four captive screw/washer fixing points per front/rear panel. Use exterior-rated fittings and retain a continuous lower barrier when panels are removed.
- 400 screws: Nonstructural hardware, Exterior panel/trim screws, #8 x 1-5/8 in. Design allowance for cladding, cabinet and light trim; count framing intersections before purchase. This allowance is not a structural sheathing fastening schedule. Check penetration and no exposed points.

### Required installation supplies

- Determine local loads, soil bearing, frost depth, footing size, anchorage and drainage before procurement. Ten roof-post anchor locations are shown; no footing capacity or concrete quantity is specified.
- Select lumber grades and check member adequacy. Design the post/beam splices, knee-brace joints, floor connections, rafter seats and both ends of every rafter tie. The ridge board is not a structural ridge beam.
- Select rated connectors and their complete fastener schedules, including required embedment, edge distances, corrosion resistance and uplift restraint. Do not treat the modeled fitting envelopes as rated products.
- Select roof and floor panel span ratings, edge gaps and structural sheathing fastening. Resolve any required diaphragm attachment and bracing.
- Confirm roof panel, trim and nest-roof order lengths from the completed framing. Select compatible underlayment, closures, sealants, flashing and washered fasteners using the chosen roof system requirements.
- Select the structural support connections for the external nests, ramp and landing. Confirm actual hinge weight ratings, offsets, latches, stops and seals against the modeled movements.
- Profile-matched closures, butyl tape, roof screws, stitch screws and flashing fasteners: Required for the selected panel product at both eaves, both rake ends and ridge. Fastener gauge, embedment, washer, spacing and closure ventilation are product/site selections, not approved by CAD.
- Footings, anchors/hold-downs, post/beam joints, floor hangers, rafter/tie connectors and structural sheathing fasteners: 10 roof-post anchor locations shown; connection classes listed in connections.md. Member grades, wind/snow/seismic loads, soil bearing/frost depth and connector capacities must be resolved before procurement.
- Exterior finish, end-grain sealer, compatible flashing tape, weather seals and sealant: Required on exposed timber/panel edges and weather joints. Select finish compatible with intended poultry use; follow cure times. Do not seal intended ventilation openings.

### Optional material depending on installation

- Gutters, downspouts, drainage aggregate, frost protection and site preparation: Roof water must drain away from the base and buried barrier. Size drainage and footing materials for the actual site; no concrete quantity is implied by anchor circles.
- Feeder, waterer, bedding and flock-specific ventilation/weather protection: Equipment not included in the timber part count. Keep permanent equipment out of the service path and reserve usable bird space.

## Materials in the model

8 × 20 Garden Chicken Coop. Counts describe 456 modeled components, including mesh/metal coverage envelopes and representative fitting plates. They are not quantities of purchased boards or separate buried-mesh sheets.

- 1/2 in exterior panel siding: 16 installed pieces
- 1/2 in exterior plywood: 8 installed pieces
- 1/2 in exterior roof plywood: 16 installed pieces
- 1/2 in plywood: 1 installed pieces
- 1/2 in welded hardware cloth, 19 ga, galvanized after welding: 37 installed pieces
- 1/4 in galvanized welded hardware cloth: 4 installed pieces
- 1x12: 2 installed pieces
- 1x2: 61 installed pieces
- 1x2 ground-contact compatible: 4 installed pieces
- 1x2 ripped to3/4x3/4: 4 installed pieces
- 1x2 ripped3/4x3/4: 3 installed pieces
- 1x4: 4 installed pieces
- 2x2: 33 installed pieces
- 2x3: 2 installed pieces
- 2x4: 55 installed pieces
- 2x6: 100 installed pieces
- 2x8: 17 installed pieces
- 3/4 in exterior hardwood threshold: 1 installed pieces
- 3/4 in exterior plywood: 8 installed pieces
- 3/4 x3/4 cleat: 17 installed pieces
- 4x4: 15 installed pieces
- 4x6 ground-contact treated: 8 installed pieces
- Exterior gate hinge: 14 installed pieces
- Metal eave trim: 2 installed pieces
- Metal roof panel: 1 installed pieces
- Metal roof panels, 36 in coverage: 16 installed pieces
- Metal roof trim: 2 installed pieces
- Two-action exterior latch: 4 installed pieces
- Two-action latch with inside release: 1 installed pieces

Not quantified:

- Footings, anchors, structural connectors and their fasteners require site-specific selection.
- Roof profiles, closures, weather seals, finishes and drainage require product/site selection.
- Feeders, waterers, bedding and climate-specific equipment are not modeled.

## Tools and equipment

- Tape measure and framing square
- String lines, stakes and a level
- Circular saw or miter saw
- Jigsaw for panel notches and openings
- Drill and driver with bits for the selected fasteners
- Clamps and a workbench
- Metal snips or shears suited to the selected wire mesh
- Router or table saw for the pop-door guide grooves
- Shovel and trenching tools
- Eye protection, hearing protection and cut-resistant gloves

## Instructions

### 1. Prepare the site

- Choose a well-drained position and check local setbacks, permits, wind, snow and frost requirements. Have underground utilities located before digging.
- Confirm the footing, anchoring and structural connection design for the site before buying materials. The drawings locate supports but do not specify footing sizes or load capacities.
- Mark a rectangle 240 x 96 in along the outside timber faces. Adjust the corners until both diagonals measure 258 1/2 in and the sides match.
- Mark the henhouse at the first 72 in of the length. Leave room outside the frame for the 12 in buried mesh return, roof overhangs, nest box and working access.
- Establish a level height reference and mark the post centers shown in the site layout. Keep surface water draining away from the coop.

Check: The footprint measures 240 x 96 in, both diagonals measure 258 1/2 in, and the support locations and site requirements are confirmed.

![Square the site layout and mark the post centers before setting the frame.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-01/step-01.png?brand=1)

Square the site layout and mark the post centers before setting the frame.

Reference drawings:

- [Floor and run plan](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-plan/plan.png?brand=1)

### 2. Set the base frame

- Select ground-contact 4x6 timbers and compatible corrosion-resistant connectors. Cut the perimeter pieces from the stock and cut lists.
- Set the perimeter on the prepared supports with the timber tops 5 1/2 in above the finished-ground reference. Keep the outside frame 240 x 96 in.
- Join the timbers at the butt joints shown in the plan. Recheck both diagonals before fixing the frame to the site-designed supports.
- Provide anchored bearing beneath every roof post. Keep mesh fasteners and ground staples separate from the structural anchors.

Check: The perimeter is level and square, with anchored bearing at every roof post.

![Set the perimeter timbers to the ground and height references.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-02/step-02.png?brand=1)

Set the perimeter timbers to the ground and height references.

### 3. Close the buried perimeter

- Use 1/2 in welded hardware cloth, 19 gauge and galvanized after welding. Excavate the perimeter trench without undermining the foundation supports.
- Form the 48 in wide wall strips into an 18 in above-ground leg, an 18 in buried leg and a 12 in outward return. Keep at least 6 in of secured overlap with the wall enclosure.
- Continue the underground barrier beneath the gate. At that opening, trim the above-ground leg to 6 in and secure it beneath the fixed threshold.
- Overlap adjoining strips and close every corner with the separate patches. Clamp or fasten the seams so an animal cannot pull them apart.
- Inspect the full perimeter, gate crossing and every foundation interface before backfilling. Protect the mesh from damage while completing the frame.

Check: The buried mesh forms a continuous enclosure beneath the walls and gate, with secured seams and corners before backfilling.

![Close the buried barrier around all sides and beneath the gate.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-03/step-03.png?brand=1)

Close the buried barrier around all sides and beneath the gate.

![Keep the buried leg and outward return continuous; secure the enclosure overlap.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-barrier/barrier.png?brand=1)

Keep the buried leg and outward return continuous; secure the enclosure overlap.

### 4. Raise the posts and beams

- Cut the 4x4 posts and position them at the marked stations. Clamp temporary braces in place while bringing each post plumb.
- Fit the paired 2x6 top beams with their top faces 96 in above the ground reference. Center every beam butt joint over its supporting post.
- Fit the permanent knee braces shown in the framing view. Use the selected structural connectors and their specified fasteners.
- Recheck post plumb, beam level and both frame diagonals before tightening the connections. Keep temporary bracing until the frame is stable.

Check: The posts are plumb, beam tops are level at 96 in, and the selected bracing and connections are fitted.

![Raise and brace the posts, paired beams and permanent knee braces.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-04/step-04.png?brand=1)

Raise and brace the posts, paired beams and permanent knee braces.

Reference drawings:

- [Full framing view](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-frame/frame.png?brand=1)

### 5. Frame and deck the raised floor

- Cut the 2x6 floor bands and joists. Set every joist top at 31 1/4 in so the 3/4 in deck finishes at 32 in.
- Mark the near joist faces from the outside henhouse end at 3 1/2, 19 1/2, 35 1/2, 47 1/4, 51 1/2 and 67 in. Fit the seam blocking shown in the floor layout.
- Cut two 48 x 48 in and two 24 x 48 in floor panels. Mark and cut the 3 1/2 x 3 1/2 in outer post notches shown on the panel layout.
- Dry-fit all four panels. Check the post locations and the panel manufacturer's edge-gap requirements before fastening to the bands, joists and blocking.
- Seal exposed panel edges with a finish suitable for this use. Keep the deck flat and the finished floor at the 32 in reference.

Check: The deck finishes at 32 in, every panel edge has support, and the post notches fit.

![Fit the floor frame, seam blocking and notched deck panels.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-05/step-05.png?brand=1)

Fit the floor frame, seam blocking and notched deck panels.

![Cut the four floor panels and mark the near faces of the joists.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-detail-floor/detail-floor.png?brand=1)

Cut the four floor panels and mark the near faces of the joists.

### 6. Frame the henhouse openings

- Frame the front and rear cleanout openings 65 in wide and 48 in high, from the 32 in floor to the 80 in header underside.
- Frame the nest-bank opening 48 in wide and 16 in high, with its lower edge 44 in above grade. Check its position against the nest-end elevation.
- Frame the pop opening 16 in wide and 20 in high. Set its lower edge at 40 in and leave space above it for the sliding door and guides.
- Fit the remaining wall and gable members shown in the framing view. Keep the high wall slots and gable vents open.
- Check every opening for size, square and alignment before cutting siding or door skins.

Check: The cleanout, nest and pop openings match the drawing dimensions, with ventilation passages left clear.

![Frame the henhouse openings and leave the ventilation passages clear.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-06/step-06.png?brand=1)

Frame the henhouse openings and leave the ventilation passages clear.

Reference drawings:

- [Long elevation and openings](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-front/front.png?brand=1)
- [Nest-end elevation](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-nest-end/nest-end.png?brand=1)

### 7. Assemble the roof frame

- Lay out one common rafter on 2x6 stock using the profile drawing. Start with a blank at least 69 in long; the roof pitch is 6:12.
- Cut the plumb ends and birdsmouth from the template. Fit the horizontal seat to the 96 in beam-top reference, then test the ridge contact before cutting matching rafters.
- Install paired rafters against the ridge board at the stations shown. Fit the adjacent horizontal rafter ties and the overhang members.
- Fit the roof seam blocking and continuous eave backing. Keep the fly-rafter profiles free of birdsmouth cuts.
- Check bearing, ridge contact, tie connections and bracing before sheathing. Use the site-specific member and fastening design for the roof loads.

Check: Rafters bear on their seats and meet the ridge; ties, roof blocking and bracing are fitted before sheathing.

![Install the rafters, horizontal ties, ridge board and roof blocking.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-07/step-07.png?brand=1)

Install the rafters, horizontal ties, ridge board and roof blocking.

![Lay out one rafter and fit the birdsmouth before cutting repeated parts.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-detail-rafter/detail-rafter.png?brand=1)

Lay out one rafter and fit the birdsmouth before cutting repeated parts.

Reference drawings:

- [Full framing view](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-frame/frame.png?brand=1)

### 8. Sheathe and roof the coop

- Dry-fit the 1/2 in roof plywood over the rafters and blocking. Keep every panel edge supported and stagger the upper-row joints as shown in the roof layout.
- Leave the panel manufacturer's required edge gaps, then fasten with the selected roof-deck schedule.
- Install compatible underlayment, eave and rake flashing, and continuous eave-to-ridge metal panels. Use the roofing manufacturer's laps, fasteners, closures and ridge details.
- Keep the metal drip edge 1/2 in beyond the rafter-tail overhang shown in the model. Confirm the final trim and gutter fit with the roofing system.
- Fit gutters and discharge water away from the base and buried mesh. Use the movement view only to understand panel placement; plan safe handling and temporary support for the actual panels.

Check: The roof deck has supported edges and the complete roofing system drains away from the base.

![Install roof decking and the selected weatherproof roofing system.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-08/step-08.png?brand=1)

Install roof decking and the selected weatherproof roofing system.

![Lower one roofing panel into position; plan handling for the actual panel.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-roof-placement-motion/roof-placement.gif?brand=1)

Lower one roofing panel into position; plan handling for the actual panel.

### 9. Clad the henhouse

- Mark the cleanout, nest, vent and pop openings on the wall panels before cutting. Dry-fit each panel against the framing.
- Fit the end-wall panels with their vertical center seam on its support. Follow the siding manufacturer's edge-gap and fastening requirements.
- Fit hardware cloth to the high wall vents and both gables. Secure all edges and install the outward-sloping rain hoods without blocking airflow.
- Close the wall-to-roof transitions while keeping the intended ventilation openings clear. Flash exposed joints so water drains outside.
- Finish outside faces and cut edges. Let all finishes cure before adding bedding or birds.

Check: The siding fits the openings, vent mesh is secure and flashing directs water outside.

![Fit the cladding, vent mesh and rain hoods.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-09/step-09.png?brand=1)

Fit the cladding, vent mesh and rain hoods.

Reference drawings:

- [Run-end elevation](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-end/end.png?brand=1)

### 10. Fit the cleanout doors

- Build the framed cleanout leaves and fit them to both long sides. Each skin is 32 5/16 in wide and 47 3/4 in high.
- Leave 1/8 in at the outside edges, top, bottom and between the paired leaves. Fit the fixed side stops without restricting movement.
- Choose exterior hinges that let each leaf swing outward clear of the siding and stops. Dry-fit the actual hinge positions before drilling.
- Fit secure latches and the removable litter-retaining boards. Provide an inside release for any latch that could trap a person.
- Open both leaves fully and remove the litter boards. Check that bedding and cleaning tools can reach the middle of the henhouse.

Check: Both pairs of cleanout leaves swing freely, latch securely and allow the litter boards to be removed.

![Fit the paired cleanout leaves, stops, hinges and latches.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-10/step-10.png?brand=1)

Fit the paired cleanout leaves, stops, hinges and latches.

![Set the cleanout leaf dimensions and operating gaps.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-detail-cleanout/detail-cleanout.png?brand=1)

Set the cleanout leaf dimensions and operating gaps.

### 11. Build the external nests

- Fit the nest support brackets and set the box floor at 44 in above grade. Check that the support faces are level before fixing the box.
- Fit the sides, front and two dividers to form three nest bays. Ease exposed edges and confirm access from the henhouse.
- Fit the sloped roof deck and weatherproof covering. Flash the lid-to-wall joint and direct runoff outside the box.
- Fit the outside access hatch, stops and secure latches. Check that the hatch opens freely and closes without a predator-access gap.
- Check every box joint and support connection before adding nesting material.

Check: The nest box is supported and weatherproofed, with clear henhouse access and a secure outside hatch.

![Build and support the external nest box; view from the nest end.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-11/step-11.png?brand=1)

Build and support the external nest box; view from the nest end.

### 12. Fit the roosts and ramp

- Build the removable roost stand with two 60 in bars. Set both top surfaces 62 in above grade and ease their upper corners.
- Cut the pop-door guides with 5/8 in wide, 1/2 in deep channels. Fit the 1/2 in door with the clearances shown in the enlarged guide section.
- Raise the door through its full 22 in travel. Check that it clears the opening, remains in both guides and can be secured closed at night.
- Fit the short sill landing and 16 in wide ramp. Support the lower end so the ramp rises 40 in over a 60 in horizontal run.
- Fit traction cleats at 4 in centers measured along the slope. Check the ramp, landing, door travel and roost removal together.

Check: The roost stand can be removed, the pop door completes its 22 in travel, and the supported ramp meets the landing.

![Fit the roosts, pop door and ramp; roof and side panels are omitted for clarity.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-12/step-12.png?brand=1)

Fit the roosts, pop door and ramp; roof and side panels are omitted for clarity.

![Cut the guide channels and check the door through its full travel.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-detail-pop-door/detail-pop-door.png?brand=1)

Cut the guide channels and check the door through its full travel.

### 13. Mesh the run and hang the gate

- Fit the run rails and 1/2 in hardware cloth. Clamp the perimeter edges, row overlaps and gable seams with the matching battens and backing.
- Join the lower enclosure to the buried barrier and fit the removable under-house panels. Close every corner and roof transition.
- Fit the fixed gate threshold and stops. The finished opening between stops is 36 in wide and 80 in high above the 7 in threshold stop.
- Hang the 37 1/4 x 79 5/8 in gate leaf to swing outward. Leave 1/8 in at each jamb and above the threshold stop, with 1/4 in at the head.
- Dry-fit hinges and the two-action latch with inside release. Confirm secure closure through the whole swing and keep the buried mesh undisturbed beneath the threshold.

Check: All mesh edges and seams are secured, and the outward-swinging gate closes and latches with the specified gaps.

![Complete the run enclosure and hang the outward-swinging gate.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-13/step-13.png?brand=1)

Complete the run enclosure and hang the outward-swinging gate.

![Check the gate leaf, stop opening and operating gaps.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-detail-gate/detail-gate.png?brand=1)

Check the gate leaf, stop opening and operating gaps.

### 14. Inspect the complete coop

- Walk the entire enclosure and inspect every mesh edge, seam, corner, foundation interface and threshold. Repair openings or loose clamping before occupancy.
- Open and close the gate, cleanout leaves, nest hatch and pop door. Check latch engagement and inside releases.
- Remove sharp wire ends, exposed fastener points, offcuts and construction debris. Confirm that ventilation openings remain clear.
- Check roof runoff, ground drainage and the buried-barrier line after backfilling. Repair erosion or disturbed mesh before birds use the run.
- Size the flock for the usable floor and run space, breed and local climate. Inspect mesh, latches, corrosion and signs of burrowing regularly.

Check: The enclosure, moving parts, ventilation, drainage and sharp-edge checks are complete before occupancy.

![Completed coop with raised henhouse and covered run.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-complete/complete.png?brand=1)

Completed coop with raised henhouse and covered run.

## Drawings and views

![Keep the buried leg and outward return continuous; secure the enclosure overlap.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-barrier/barrier.png?brand=1)

Keep the buried leg and outward return continuous; secure the enclosure overlap.

![Completed coop with raised henhouse and covered run.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-complete/complete.png?brand=1)

Completed coop with raised henhouse and covered run.

![Set the cleanout leaf dimensions and operating gaps.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-detail-cleanout/detail-cleanout.png?brand=1)

Set the cleanout leaf dimensions and operating gaps.

![Cut the four floor panels and mark the near faces of the joists.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-detail-floor/detail-floor.png?brand=1)

Cut the four floor panels and mark the near faces of the joists.

![Check the gate leaf, stop opening and operating gaps.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-detail-gate/detail-gate.png?brand=1)

Check the gate leaf, stop opening and operating gaps.

![Cut the guide channels and check the door through its full travel.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-detail-pop-door/detail-pop-door.png?brand=1)

Cut the guide channels and check the door through its full travel.

![Lay out one rafter and fit the birdsmouth before cutting repeated parts.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-detail-rafter/detail-rafter.png?brand=1)

Lay out one rafter and fit the birdsmouth before cutting repeated parts.

![Henhouse interior with roof and side panels removed.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-interior/interior.png?brand=1)

Henhouse interior with roof and side panels removed.

![Coop with the roof covering and deck removed.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-roof-off/roof-off.png?brand=1)

Coop with the roof covering and deck removed.

![Lower one roofing panel into position; plan handling for the actual panel.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-roof-placement/roof-placement.png?brand=1)

Lower one roofing panel into position; plan handling for the actual panel.

![Lower one roofing panel into position; plan handling for the actual panel.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-roof-placement-motion/roof-placement.gif?brand=1)

Lower one roofing panel into position; plan handling for the actual panel.

![Square the site layout and mark the post centers before setting the frame.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-01/step-01.png?brand=1)

Square the site layout and mark the post centers before setting the frame.

![Set the perimeter timbers to the ground and height references.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-02/step-02.png?brand=1)

Set the perimeter timbers to the ground and height references.

![Close the buried barrier around all sides and beneath the gate.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-03/step-03.png?brand=1)

Close the buried barrier around all sides and beneath the gate.

![Raise and brace the posts, paired beams and permanent knee braces.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-04/step-04.png?brand=1)

Raise and brace the posts, paired beams and permanent knee braces.

![Fit the floor frame, seam blocking and notched deck panels.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-05/step-05.png?brand=1)

Fit the floor frame, seam blocking and notched deck panels.

![Frame the henhouse openings and leave the ventilation passages clear.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-06/step-06.png?brand=1)

Frame the henhouse openings and leave the ventilation passages clear.

![Install the rafters, horizontal ties, ridge board and roof blocking.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-07/step-07.png?brand=1)

Install the rafters, horizontal ties, ridge board and roof blocking.

![Install roof decking and the selected weatherproof roofing system.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-08/step-08.png?brand=1)

Install roof decking and the selected weatherproof roofing system.

![Fit the cladding, vent mesh and rain hoods.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-09/step-09.png?brand=1)

Fit the cladding, vent mesh and rain hoods.

![Fit the paired cleanout leaves, stops, hinges and latches.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-10/step-10.png?brand=1)

Fit the paired cleanout leaves, stops, hinges and latches.

![Build and support the external nest box; view from the nest end.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-11/step-11.png?brand=1)

Build and support the external nest box; view from the nest end.

![Fit the roosts, pop door and ramp; roof and side panels are omitted for clarity.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-12/step-12.png?brand=1)

Fit the roosts, pop door and ramp; roof and side panels are omitted for clarity.

![Complete the run enclosure and hang the outward-swinging gate.](https://diyplans.org/media/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/image-step-13/step-13.png?brand=1)

Complete the run enclosure and hang the outward-swinging gate.

## Downloads

- [Complete free plan package](https://diyplans.org/downloads/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/package/garden-coop-complete.zip): ZIP, 2514017 bytes, file revision 2. Editable FreeCAD and STEP models, five material and cutting schedules, dimensioned drawings, illustrated offline instructions and connection requirements.
  SHA-256: 00f79e1c3d52fada60124162be15de44fa5b60a4cdf42589eaac5323964f4db0
- [Editable FreeCAD model](https://diyplans.org/downloads/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/native-cad/garden-coop.FCStd): FCStd, 508873 bytes, file revision 2. Editable FreeCAD model for the 8 × 20 Garden Chicken Coop.
  SHA-256: 0c494bba2ffef83d5c578a60663ef2f710315a789398bb7fd3555e8e02431251
- [STEP solid model](https://diyplans.org/downloads/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/cad-step/garden-coop.step): STEP, 3204442 bytes, file revision 2. STEP solid model for the 8 × 20 Garden Chicken Coop.
  SHA-256: d1d12c136e12795f492df4d83a1e8d15938dd8bd05384c3caa19d86a0e60a65f
- [Material purchase list](https://diyplans.org/downloads/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/materials/materials.csv): CSV, 26261 bytes, file revision 2. Material purchase list for the 8 × 20 Garden Chicken Coop.
  SHA-256: 9a9a2428ec0c4895fd2dafa1e9f1bfc02809638c6a3041138358b61c15909fad
- [Part cut list](https://diyplans.org/downloads/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/cut-list/cut-list.csv): CSV, 59154 bytes, file revision 2. Part cut list for the 8 × 20 Garden Chicken Coop.
  SHA-256: c381037b0ad4918d19028b424d6ac39461bddc9724fcd9f2c320f8688f7c137c
- [Lumber cutting layout](https://diyplans.org/downloads/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/stock-layout/stock-layout.csv): CSV, 27614 bytes, file revision 2. Lumber cutting layout for the 8 × 20 Garden Chicken Coop.
  SHA-256: 9b7f2514f6deefa395028e33f5dfb9d77bd8899443032632919dfbc93e7a0bb2
- [Sheet cutting layout](https://diyplans.org/downloads/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/sheet-layout/sheet-layout.csv): CSV, 5976 bytes, file revision 2. Sheet cutting layout for the 8 × 20 Garden Chicken Coop.
  SHA-256: 9dcefa2189f0cf3c5c96742d2c5e28208a42c9268435b18f362df05c354e0028
- [Mesh cutting layout](https://diyplans.org/downloads/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/mesh-layout/mesh-layout.csv): CSV, 2121 bytes, file revision 2. Mesh cutting layout for the 8 × 20 Garden Chicken Coop.
  SHA-256: c8946efa920979fc88f3b03cd6fca9c30d92d236495c32c051eccf1629e729cd
- [Plan disclaimer](https://diyplans.org/downloads/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/disclaimer/disclaimer.txt): OTHER, 1666 bytes, file revision 2. Plan disclaimer for all files in this plan package.
  SHA-256: 4e372f53e493957bee07ab80376c1d90246af298ad3fa10100edbe9ce451e65c
- [License and copyright notice](https://diyplans.org/downloads/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/license/license.txt): OTHER, 1182 bytes, file revision 2. License and copyright notice for all files in this plan package.
  SHA-256: 76525ba44c7ed55fc57002886df575c7e8d26220f1ad553c432eed4c8d1d4797
- [Connections and fittings](https://diyplans.org/downloads/packages/0b4c349f9f9e5a618f31b3c8a760dd900fe8b46a89b674d97aec8c30e588bb4d/connections/connections.md): OTHER, 6357 bytes, file revision 2. Connection requirements, mesh fastening details and site-specific product selections.
  SHA-256: 9e9bd5d99e1a8137b569420632f7370cd57531351fdc30a3fb3a976d9acfbec0

## Using the CAD files

- Open the FCStd model in FreeCAD. Use STEP for precise solid exchange.
- The model uses millimeters internally; the build drawings use inches.
- Retain the shown rafter ties. Site-specific structural design is required before construction.
- The native file contains 456 editable solid parts. Foundation locations are dimensioned on the drawings; symbolic anchor circles and display folders are omitted from the distribution model.