# Purple martin birdhouse: Two levels, 16 compartments

[View illustrated instructions](https://diyplans.org/plans/purple-martin-birdhouse-6344/variants/two-level)

[Plan and other configurations](https://diyplans.org/plans/purple-martin-birdhouse-6344.md)

Sixteen compartments on two removable levels, with the upper entrances rotated 90 degrees.

## License

[CC BY-NC-SA 4.0 International](https://creativecommons.org/licenses/by-nc-sa/4.0/). You may share and adapt this free design for noncommercial purposes with appropriate credit, a link to the license, an indication of changes, and the same license on adaptations. See [the FAQ](https://diyplans.org/faq#license) for details and exceptions.

Revision: 3

Status: published

Difficulty: intermediate

## Before you start

- Use plywood that measures a full 3/8 inch thick so the butt joints and half-lap partitions fit.
- Rooms are 6 x 6 x 6 inches with 2-1/2-inch entrances. Current purple martin guidance favors deeper rooms and smaller entrances; confirm the housing dimensions before building.
- Plan the support and a way to inspect and clean every compartment before buying mounting hardware.

## Dimensions

- Floor width: 30 in. Square floor footprint.
- Wall enclosure width: 19 1/2 in. Square exterior enclosure; 3/8-inch plywood.
- Clear room width: 6 in. Each nesting compartment is 6 x 6 x 6 inches.
- Roof overall width: 33 7/16 in. Approximate. Includes sloping eave extensions.
- Height including mounting plinth: 21 3/4 in. Approximate. Excludes post and footing.
- Entrance diameter: 2 1/2 in. Current purple martin guidance favors smaller entrances.

## Shopping list

The two-sheet layout allows a 1/8-inch saw kerf and 1/4-inch edge trim. Solid stock includes cutting allowance. Confirm hardware sizes and quantities after dry-fitting the parts.

- 2 sheets: Exterior plywood, 3/8 in actual x 48 x 96 in. Allows 1/8 in saw kerf and 1/4 in edge trim. Check both faces and measure the thickness.
- 1 length: Solid wood square molding, 3/4 x 3/4 in x 8 ft. Four 13-1/2 in and two 20 in cuts total 94 in. Five 1/8 in saw kerfs and two 1/4 in end trims bring the required length to 95-1/8 in.
- 1 length: Nominal 2 x 2 solid wood, Actual 1-1/2 x 1-1/2 in x 24 in. Cut four 1-1/2 in cubes for the corners of the mounting plate.
- 1 piece: Corrosion-resistant wire screening, At least 8 x 8 in usable piece. Cut two 4 x 4 in patches for the gable vents. Select the mesh and attachment fasteners.
- 8 sets: Exterior hook-and-eye latch sets, Select reach and screw embedment after dry fit. Allows four sets per removable joint. Check their fit and add suitable backing.

### Required installation supplies

- Exterior adhesive, joint reinforcement and suitable fasteners, selected after a trial assembly.
- Screen mesh and fasteners, latch backing, and an exterior roof and edge sealing system.
- Post or pipe, connections and footing sized for the site, plus a lowering system or safe access for inspection and cleaning.

## Materials in the model

Physical wood parts in this exact CAD model; buy stock using the purchase list.

- 3/8 in exterior plywood: 25 installed pieces
- 3/4 x 3/4 in solid wood cleat: 6 installed pieces
- nominal 2 x 2, actual 1-1/2 square: 4 installed pieces

Not quantified:

- Joint fasteners, adhesive, screen attachment, latch backing and weather seals.
- Post/pipe, brackets, foundation, lowering equipment and installation supplies.

## Tools and equipment

- Saw with a guide for straight cuts and a 21.801-degree bevel; jigsaw for square shaft openings.
- Drill with 2-1/2-inch hole saw and a backing board.
- Clamps, square, tape measure, marking tools, and a chisel or router for half-lap slots.
- Sanding tools and eye/hearing protection.

## Instructions

### 1. Check plywood and mounting access

- Measure the plywood before laying out joints; it must be 3/8 inch thick. Confirm the 6-inch rooms and 2-1/2-inch entrances suit the intended use. Plan secure mounting and access for cleaning before buying support hardware.

Check: Plywood measures 3/8 in and the mounting and cleaning-access requirements are understood.

![Two-level birdhouse with a pitched roof and round entrances.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-assembled/assembled.png?brand=1)

Eight rooms per level; the upper entrance pattern turns 90 degrees.

### 2. Cut the flat panels

- Follow the two-sheet cutting layout, leaving a 1/8-inch saw kerf between parts. Cut each 30-inch square floor and the roof base, then cut a centered 6-inch square air opening. Its edges are 12 inches from the panel edges. Keep the two 12-inch mounting plates solid.

Check: Flat panels match the cut list; floor and roof-base air openings are centered and clear.

![Two plywood sheets with labeled part outlines and saw-cut spacing.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-cutting-layout/cutting-layout.png?brand=1)

Two-sheet layout with 1/8-inch saw kerf and 1/4-inch edge trim.

### 3. Cut walls and half-lap joints

- Cut W1 at 19-1/2 x 6 inches. Cut W2, P1 and P2 at 18-3/4 x 6 inches. On P1 and P2, start the two slots 6 and 12-3/8 inches from the same end. Each slot is 3/8 inch wide and 3 inches deep. Cut P1 slots from the top and P2 slots from the bottom. Test the fit on scrap first; use the wall and partition drawing to check the layout.

Check: Walls and partitions dry-fit with matching 3/8-in-wide,3-in-deep half-laps.

![Wall and partition drawing with entrance locations and half-lap cuts.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-wall-layout/wall-layout.png?brand=1)

Use the wall and partition drawing to locate entrances and half-lap slots.

### 4. Drill the entrances

- Clamp a backing board behind every cut. W1 has three 2-1/2-inch holes centered 3-3/8, 9-3/4 and 16-1/8 inches from its left end. W2 has one hole centered 9-3/8 inches from its end. All centers are 3-1/4 inches above the bottom edge. Smooth splinters without enlarging the openings.

Check: Entrance holes are smooth,2-1/2 in in diameter and positioned at the shown centers.

![Wall and partition drawing with entrance locations and half-lap cuts.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-wall-layout/wall-layout.png?brand=1)

Use the wall and partition drawing to locate entrances and half-lap slots.

### 5. Assemble each level

- Interlock P1 and P2 to form the center shaft and cross partitions. Butt the 18-3/4-inch side walls between the 19-1/2-inch front and back walls. Check all eight rooms and the center shaft for a clear 6 x 6-inch opening. Center the 19-1/2-inch square enclosure on its floor, leaving 5-1/4-inch porches. Use a trial assembly to select exterior adhesive or reinforcement molding and suitable fasteners.

Check: Each completed level has eight clear 6×6- in rooms and an unobstructed center shaft.

![Birdhouse with its roof removed, exposing eight compartments around the central air shaft.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-open/open.png?brand=1)

The removable roof provides access to the rooms for cleaning.

### 6. Make the removable roof

- Cut each G blank to a 30-inch base and 6-inch rise at the midpoint. Drill the 2-1/2-inch vent centered 15 inches across and 3 inches above its base. Fit screening inside each gable before closing the roof. Place the gable outer faces 2 inches from the roof-base front and back edges. Follow the roof and mounting drawing for the cleat and roof-sheet positions.

Check: Gables are positioned 2 in from roof-base ends and their vents have fitted screening.

![Drawing of the roof gable, ridge joint, cleats and ventilated mounting base.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-roof-detail/roof-detail.png?brand=1)

Roof and mounting drawing. Keep the central shaft and mounting air gap open. Inch layout labels are rounded to the nearest 1/16; retain stated clearance and fit allowances.

### 7. Fit the roof sheets and cleats

- Fit the four 13-1/2-inch slope cleats immediately inside the gables against the roof underside, with their upper ends 1/2 inch horizontally from the ridge. Center a 20-inch cleat along the inside bottom of each gable. Dry-fit both 30 x 18-inch roof sheets with their ridge edges beveled 21.801 degrees from square. Preserve the 18-inch outer face width. Select fasteners and an exterior sealing system suited to the plywood. Seal the ridge and exposed plywood edges.

Check: Both 18- in outer-face roof sheets dry-fit on the gables with a closed 21.801-degree ridge bevel.

![Drawing of the roof gable, ridge joint, cleats and ventilated mounting base.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-roof-detail/roof-detail.png?brand=1)

Roof and mounting drawing. Keep the central shaft and mounting air gap open. Inch layout labels are rounded to the nearest 1/16; retain stated clearance and fit allowances.

### 8. Build the ventilated mounting base

- Laminate the two 12-inch square plates into a 3/4-inch plate. Place a 1-1/2-inch cube at each corner, flush to the plate edges. Center this assembly below the first floor, leaving a 1-1/2-inch open air gap above the plate. Keep the center shaft and side air inlets unobstructed. Have the post connection sized for the house, mounting height and site loads.

Check: The laminated mounting plate and four spacer cubes leave a clear 1-1/2- in air gap.

![Drawing of the roof gable, ridge joint, cleats and ventilated mounting base.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-roof-detail/roof-detail.png?brand=1)

Roof and mounting drawing. Keep the central shaft and mounting air gap open. Inch layout labels are rounded to the nearest 1/16; retain stated clearance and fit allowances.

### 9. Stack and latch the removable sections

- Turn the entire upper level 90 degrees so its three-entrance sides face the lower level's one-entrance sides. Place its floor directly on the lower walls, then set the roof base on the upper walls. Align all center openings. Fit four hook-and-eye sets at each removable joint, with backing suited to the hardware. Keep the upper level and roof removable; do not glue these joints.

Check: Removable sections align with the center shaft and engage their fitted latches without glue.

![Roof and birdhouse sections separated to show how they stack.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-exploded/exploded.png?brand=1)

Keep these joints removable and secure them with hook-and-eye latches.

### 10. Mount the house and provide cleaning access

- Complete drainage, screening, fasteners, weather sealing and secure latching before outdoor installation. Before using a 4 x 4 post or 2-1/2-inch pipe at the suggested height of 15-20 feet, have the support, connections and footing designed for the site. Provide a lowering system or safe access to inspect and clean every compartment.

Check: Site-specific support, secure latches and safe access are complete before outdoor installation.

![Two-level birdhouse with a pitched roof and round entrances.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-assembled/assembled.png?brand=1)

Eight rooms per level; the upper entrance pattern turns 90 degrees.

## Drawings and views

![Two-level birdhouse with a pitched roof and round entrances.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-assembled/assembled.png?brand=1)

Eight rooms per level; the upper entrance pattern turns 90 degrees.

![Birdhouse with its roof removed, exposing eight compartments around the central air shaft.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-open/open.png?brand=1)

The removable roof provides access to the rooms for cleaning.

![Roof and birdhouse sections separated to show how they stack.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-exploded/exploded.png?brand=1)

Keep these joints removable and secure them with hook-and-eye latches.

![Two plywood sheets with labeled part outlines and saw-cut spacing.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-cutting-layout/cutting-layout.png?brand=1)

Two-sheet layout with 1/8-inch saw kerf and 1/4-inch edge trim.

![Wall and partition drawing with entrance locations and half-lap cuts.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-wall-layout/wall-layout.png?brand=1)

Use the wall and partition drawing to locate entrances and half-lap slots.

![Drawing of the roof gable, ridge joint, cleats and ventilated mounting base.](https://diyplans.org/media/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/image-roof-detail/roof-detail.png?brand=1)

Roof and mounting drawing. Keep the central shaft and mounting air gap open. Inch layout labels are rounded to the nearest 1/16; retain stated clearance and fit allowances.

## Downloads

- [Complete plan package](https://diyplans.org/downloads/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/download-package/purple-martin-birdhouse-two-levels-16-compartments-r3-package.zip): ZIP, 505135 bytes, file revision 3. CAD models and schedules for this configuration. Read instructions and dimensioned drawings on the website.
  SHA-256: c5a62fdcfcba7e6a98e10fc2fdc0305d9a2c52a60da9ba037cca86280ce258a6
- [FreeCAD model](https://diyplans.org/downloads/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/download-native/purple-martin-birdhouse-two-levels-16-compartments-r3-model.FCStd): FCStd, 344946 bytes, file revision 3. Inspect the rooms, roof and mounting layout in FreeCAD.
  SHA-256: 130b8f5a856fa1ba0dc3edb688703f983b444c9458059cd0bee86099288ccb8e
- [STEP model](https://diyplans.org/downloads/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/download-step/purple-martin-birdhouse-two-levels-16-compartments-r3-model.step): STEP, 359013 bytes, file revision 3. Open the house in other CAD software.
  SHA-256: a0f299a1ad2f22a86da4729baee3e5206158b85686a15574a61d0cfc51420ffe
- [Blender scene](https://diyplans.org/downloads/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/download-blender/purple-martin-birdhouse-two-levels-16-compartments-r3-scene.blend): BLEND, 989507 bytes, file revision 3. Editable mesh scene with simple materials.
  SHA-256: b0d423cefb8583ba27c3575fcc467cd4b09d55ff6af7c549291807a5ce639968
- [Cut list](https://diyplans.org/downloads/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/download-cut-list/purple-martin-birdhouse-two-levels-16-compartments-r3-cut-list.csv): CSV, 735 bytes, file revision 3. Part sizes and quantities.
  SHA-256: 2ab6a8b866eb225936e500e6ba044ce372d39d777534990c58cea64aa52878b9
- [Shopping list](https://diyplans.org/downloads/packages/657b6842d49ea2a89911de3db44ab7445ce39a70825e5763167e92e5812e2721/download-shopping-list/purple-martin-birdhouse-two-levels-16-compartments-r3-shopping-list.csv): CSV, 1747 bytes, file revision 3. Stock sizes, purchase quantities and cutting allowances.
  SHA-256: 4b970c766dec2c6fad31dc0b203c58279a51e1b6ae22a4f6c317e51abe3321c0

## Using the CAD files

- Open the .FCStd file in FreeCAD to edit the model. Import the STEP file into other CAD software.

## Sources

Based on the 1969 Purple Martin Birdhouse drawing hosted by North Dakota State University. Models, drawings and instructions by DIY Plans.

- [Original EX.6344 drawing](https://www.ag.ndsu.edu/aben-plans/6344.pdf)
- [NDSU miscellaneous building plans catalog](https://www.ndsu.edu/agriculture/ag-hub/ag-topics/ag-buildings/building-plans/miscellaneous-building-plans)
- [Texas Parks and Wildlife purple martin management guidance](https://tpwd.texas.gov/publications/pwdpubs/media/pwd_bk_w7000_0254.pdf)